News

March 2023

Cube awarded Santos Campbell platform structural re-certification scope after decommissioning delayed.

February 2023

Cube provide heavy lift review & assurance services to Fortescue Future Industries

February 2023

Cube modify the Clear Cut Intervention (CCI) Hydraulic Workover Tower interface adaptor structure to fit with the VOGA WNB wellbay and safely transfer operating loads into the deck without the need for guy wires.  This resulted in a quicker and safer rig-up operation.

December 2022

Cube Offshore develop Risk Based Inspection subsea & topsides scopes of work for the Santos John Brookes platform

December 2022

Cube refurbish EFL subsea deployment frame for BHP/WEL including modification design, strengthening work, load testing & re-certification (CCLE)

September 2022

Cube design an Onshore Substructure to support a Hydraulic Workover Unit over a land based oil wells. Total operating loads in excess of 300t whilst all components assemble / disassemble easily for road transport.  7m vertical height to straddle over BOP with approx. 12m x 12m footprint.

June 2022

Cube awarded the structural integrity assessment scope for a range of minimal facility offshore platforms owned by Santos.

April 2022

Cube design a series of subsea coffer dams to facilitate subsea weld repairs to ship hulls for MMA Offshore.

March 2022

Cube design 2 no. Mud Tank modules to support offshore well servicing operations on the Jadestone Stag platform.  Work was integrated with WeldTech fabricators to produce an integrated design & build solution.

February 2022

Cube provide specialist Rotating Equipment services to the Santos Dorado project.

January 2022

Cube contracted to provide innovating strengthening design to existing Woodside FPSO topsides module.  Structural integrity assessed and a “cold work” bolted bracing system developed to alleviate both module and deck utilisations.  Cube worked closely with WEL technical integrity and their offshore contractor to provide a practical and technically robust solution.

December 2021

Cube Offshore provide Structural Integrity support to Santos for the Bayu Undan life extension project.