The Scope
Subsea7 required 2 off, 1 tonne, torque tool stands to support their torque tools subsea. Cube’s scope was to design, supply, project manage and verify the delivery of these stands.
The Outcome
Cube Offshore designed, fabricated, tested and verified both torque tools stands.
The torque tools were lift certified and a FAT procedure was written up along with other documentation for Chevron’s stringent quality requirements.




