Projects

Burner Boom Structural Assessment

The Scope

Expro required verification of the structural integrity of their 60ft GEO burner boom for the West Telesto rig.

The Outcome

Cube Offshore verified the burner boom to comply with drilling standard DNV-OS-E101. The burner boom was designed for maximum operating temperatures and environmental conditions. During transit and extreme weather conditions the burner boom will be demounted and stored on deck or back-loaded.