The Challenge
Woodside required modular seafastening grillages for 2 no. electrical modules (approx. 40t each) for two separate vessel transports (commercial transport vessel & AHTS). The solution had to avoid welding to the modules, resist vessel-motion and overturning loads, remain within deck capacities, and support efficient road transport, assembly and lifting. Furthermore, the modules were to be stable under their own self weight without hold-down for the Dampier to GWA transit to facilitate ease of lift off from the AHTS vessel.
The Solution
We developed two modular steel grillages, each split into four road-transportable panels and assembled using bolted splices. The widened footprint provides inherent stability, while integrated roll and pitch stops transfer lateral loads. Removable mechanical hold-downs secure the modules for the higher D-Type transport loads. The grillages, padeyes and rigging were engineered for safe panel and complete-assembly lifting and practical vessel installation.
The Scope
- Basis of Design and structural concept for stakeholder review
- Transport, stability and deck-loading assessment
- Detailed structural analysis & code checking
- Fabrication, lifting and installation drawings
- Material-substitution and load-test support
The Outcome
Cube Offshore delivered a code-compliant transport, lifting and installation package for two interchangeable grillages. The modular arrangement simplified fabrication, road transport and quayside assembly. Structural checks confirmed adequate capacity and stability, with governing vessel deck pressure well below the available deck capacities. Adopting a transverse module orientation on the AHTS to GWA ensured a hands free and safe vessel lift of the modules onto GWA.
Bolted / clamped hold down detail avoiding welding directly to the modules
Quayside assembly schematic
Lift schematics
Mobilisation onto AHTS (Go Aurelia) schematic