December 2014
Cube Offshore to perform assessment work on Subsea7 PLET for ConcoPhillips Bayu Undan Subsea step-out.
December 2014
Cube Offshore install and commission the Subsea Tree Guidance System components onto the Ensco 5006 drilling rig in Singapore for INPEX Ichthys drilling campaign. Full scale fabricated replicas of the Ichthys Subsea Trees and EDP/LRP used for comprehensive System Integration Testing (SIT) of the guidance system.
November 2014
Cube Offshore has been engaged by Vermilion (VOGA) to provide engineering support for Wandoo B Drilling campaign using the Noble Drilling Tom Prosser rig.
May 2014
Cube Offshore support Sea Trucks Group mobilizing the J34 vessel out of Singapore. Scope included retrofitting additional 260POB accommodation module onto the back deck c/w support grillage, access & egress all-round / expediting the fabrication, delivery and seafastening of the 2-part gangway landing platform to be suspended from the Exxon Arkutun-Dagi / liaison with ABS for class approval.
March 2014
Cube Offshore awarded the design of the Ensco 5006 subsea tree guidance system for INPEX Ichthys drilling campaign. 3D laser scan of moonpool area to be carried out to facilitate design modelling in an
December 2013
Cube Offshore awarded design of several major installation support structures by Sea Trucks Group (STG). Structures included support / interface grillage with the Sea Trucks Group (STG) Jascon 25 deck for the 1000t temporary accommodation modules; all modular access & egress walkways & stair towers around the 4 story temp. accommodation modules and a 2-part gangway landing platform to be suspended from the Exxon Arkutung-Dagi platform offshore Sakhalin Island.
November 2013
Cube Offshore carry out lift planning for the removal of 2 x temporary accommodation modules on WNA by Vermillion (VOGA). Scope included dynamic analysis of accommodation modules, rigging design, lift plan and lift certification.
October 2013
Cube Offshore awarded engineering and construction scope by Maersk Drilling to repair & strengthen the burnerboom hull supports and miscellaneous additional rig modifications on board the Nanhai6 drilling rig.
September 2013
Cube Offshore awarded the design of misc. subsea installation aids by FugroTSM
August 2013
Cube Offshore awarded technical governance role for the INPEX Ichthys GEP end termination support arrangement.
May 2013
Cube Offshore awarded a range of engineering scopes of work by Technip to support the Balnaves offshore construction campaign.
April 2013
Cube Offshore awarded the contract for the management of the Ensco 5006 major upgrade scope (USD$120m engineering & construction) to be carried out in Keppel Fels Singapore shipyard on behalf of INPEX.