March 2016
Cube Offshore awarded contract to provide validation / QC services for 49 x individual subsea equipment items and issue Lift Certificates to GE Oil & Gas for the Woodside Julimar project.
February 2016
Cube Offshore win a competitive tender for the innovative design and delivery of a completely non-welded seafastening grillage designed to fit a range of AHTS vessels and a range of Woodside subsea equipment.
January 2016
Cube Offshore provide designs, equipment and installation procedures to retrofit a boat access platform, ladder and stairways on Quadrant’s Chervil monopod to support well decommissioning work.
December 2015
Cube Offshore mobilize offshore to install a range of pre-fabricated access platforms, stairways and ladders onto the Ensco 5006 drilling rig for the INPEX Ichthys campaign
December 2015
Cube Offshore design offshore lift frames in accordance with DNV 2.7-1 for Trident owned HPU and Mini-reeler.
November 2015
Cube Offshore engaged by Quadrant to provide structural reassessment of Chervil monopod.
September 2015
Cube Offshore carry out validation / QC services and issue Lift Certificates for 49 separate subsea equipment items supplied by GE Oil
September 2015
Cube Offshore awarded contract to analyse mud flow in the Ensco 5006 pit rooms and design
September 2015
Cube Offshore provide expert witness evidence in court proceedings relating to offshore structural / installation engineering. Client withheld.
August 2015
Contract Resources engage Cube Offshore to design and supply temporary support for bundle puller for vessel in module for Apache
August 2015
Cube Offshore to verify subsea designs for Kentz on Chevron
June 2015
Cube Offshore provide technical input to the development of the APIA Pipeline Engineering Competency Standards by developing a) Design of Subsea Structures and b) Interface with Subsea Structures competency requirement standards.