May 2015
Cube Offshore awarded mechanical / structural verification scope to demonstrate code compliance for Apache
April 2015
Cube Offshore to assist Inpex Operations with drafting new Engineering Lift Specification and review of lifting operations in Australia.
April 2015
Cube Offshore awarded scope to provide independent strength assessment of Technip PLET for Shell Prelude using FEA modelling techniques.
April 2015
Cube Offshore mobilize offshore onto the Ensco 5006 drilling rig for the installation of dedicated cyclone rated tree stands and well testing spread seafastening.
April 2015
Cube Offshore provide Lift Certicate for iTech ROV LARS spread
April 2015
Cube Offshore provide seafastening design to Neptune for ROV and grouting spread on the Mermaid Investigator
March 2015
Cube Offshore awarded structural analysis scope to confirm integrity of Expro 60
March 2015
Cube to provide additional in-house and external installation engineering support to Technip on Chevron’s Wheatstone project.
March 2015
Cube Offshore carry out validation / QC services and deliver Lift Certification for 4 x equipment items belonging to GE Oil
February 2015
Cube Offshore provide engineering verification to Apache Compressor Module sea transportation design.
January 2015
Cube Offshore awarded consulting engineering scope to support INPEX Technical Assurance group with re-writing of the INPEX Lifting Standards and analysis of all Ichthys project lifting incidents to date.
January 2015
Cube Offshore deliver 5 x ROV Baskets (DNV2.7-3 rated) to Specialised Offshore Services.