Inpex Ichthys Drilling Support

Scope

Inpex required technical and project engineering support to finalise the award of the Drill Rig lease contract for the phase 1 drilling works. The support required included visiting the rig to site survey offshore Israel, compiling the scope of rig modification work required to prepare and execute the Ichthys scope and attendance at final negotiations in Houston.

Cube was engaged to provide this support.

 

Outcome

Cube provided the following support:

Expediting information flow between Inpex and Ensco

Facilitate a robust conceptual Scope of Work & cost estimate (+/-20%)

Further develop scope of work through detailed engineering and construction in the next phase.

Incorporation of scope of work into the lease contract.

Attend KO meeting at Ensco office Houston

Attend interim meeting at Ensco office Houston

Rig visit (Israel)

Liaison with Ensco to expedite Rig Modification SoW/concepts/cost estimate proposals

Liaison within Inpex to expedite approval/acceptance of Rig Mod. SoW/concepts/cost estimate proposals.

Monitoring of Ensco progress

Production of E5006 deck layout drawings with input from Inpex